Project

General

Profile

Tâche #11362

Scénario #11289: Annonce 2.4.1.1-RC1 (ou RC2) et ISO

Faire une image ISO 2.4.1.1-RC avec les derniers paquets proposed-updates

Added by Fabrice Barconnière over 6 years ago. Updated over 6 years ago.

Status:
Fermé
Priority:
Normal
Start date:
04/14/2015
Due date:
% Done:

100%

Estimated time:
3.00 h
Spent time:
Remaining (hours):
0.0

Associated revisions

Revision 7edd36e6 (diff)
Added by Fabrice Barconnière over 6 years ago

Nouvelle image de démarrage 2.4.1.1-rc2

ref #11362 @30m

Revision 8505c97a (diff)
Added by Daniel Dehennin over 6 years ago

Nouvelle image de démarrage 2.4.1.1-rc2

ref #11362 @30m

Revision aedae3f2 (diff)
Added by Fabrice Barconnière over 6 years ago

Nouvelle image de démarrage 2.4.1.1-rc2

ref #11362 @30m

Revision e7c6fb7f (diff)
Added by Daniel Dehennin over 6 years ago

Nouvelle image de démarrage 2.4.1.1-rc2

ref #11362 @30m

Revision 9ebb0c73 (diff)
Added by Fabrice Barconnière over 6 years ago

Nouvelle image de démarrage 2.4.1.1-rc2

ref #11362 @30m

Revision 592e3620 (diff)
Added by Daniel Dehennin over 6 years ago

Nouvelle image de démarrage 2.4.1.1-rc2

ref #11362 @30m

Revision 0a5c36e4 (diff)
Added by Fabrice Barconnière over 6 years ago

Nouvelle image de démarrage 2.4.1.1-rc2

ref #11362 @30m

Revision 4a04bcdb (diff)
Added by Daniel Dehennin over 6 years ago

Nouvelle image de démarrage 2.4.1.1-rc2

ref #11362 @30m

History

#1 Updated by Fabrice Barconnière over 6 years ago

  • Assigned To set to Fabrice Barconnière

#2 Updated by Fabrice Barconnière over 6 years ago

  • Status changed from Nouveau to En cours

#3 Updated by Fabrice Barconnière over 6 years ago

  • % Done changed from 0 to 50
  • Remaining (hours) changed from 3.0 to 1.5
  • Distribution changed from EOLE 2.5 to EOLE 2.4
  • Modification image de démarrage
  • génération des ISOs
  • Actualisation de la page wiki

#4 Updated by Fabrice Barconnière over 6 years ago

Relance de la génération des iso. Il n'y avait plus assez de place sur castor.

#5 Updated by Fabrice Barconnière over 6 years ago

  • % Done changed from 50 to 100
  • Remaining (hours) changed from 1.5 to 0.0

#6 Updated by Scrum Master over 6 years ago

  • Status changed from En cours to Résolu

#7 Updated by Scrum Master over 6 years ago

  • Status changed from Résolu to Fermé

Also available in: Atom PDF