Project

General

Profile

Scénario #21465

Publier la solution proposée afin de limiter les effets d’accroissement de ibdata1 sur EOLE 2.5

Added by Joël Cuissinat almost 4 years ago. Updated over 3 years ago.

Status:
Terminé (Sprint)
Priority:
Normal
Assigned To:
Category:
-
Start date:
01/02/2018
Due date:
01/26/2018
% Done:

100%

Estimated time:
3.00 h (Total: 9.00 h)
Spent time:
(Total: 6.50 h)
Story points:
1.0
Remaining (hours):
0.00 hour
Velocity based estimate:
0 days

Description

Attente des retours utilisateurs avant une éventuelle diffusion sur les listes / la doc / le blog ?


Subtasks

Tâche #22657: Publication de la solution pour limiter l'accroissement de ibdata1 sur EOLE 2.5FerméLaurent Flori


Related issues

Copied from eole-mysql - Tâche #21334: Test de la solution proposée en https://dba.stackexchange.com/questions/8982/what-is-the-best-way-to-reduce-the-size-of-ibdata-in-mysql/8983#8983 Fermé 09/11/2017

History

#1 Updated by Joël Cuissinat almost 4 years ago

  • Copied from Tâche #21334: Test de la solution proposée en https://dba.stackexchange.com/questions/8982/what-is-the-best-way-to-reduce-the-size-of-ibdata-in-mysql/8983#8983 added

#2 Updated by Joël Cuissinat almost 4 years ago

  • Project changed from eole-mysql to Distribution EOLE
  • Remaining (hours) changed from 0.0 to 3.0

#3 Updated by Scrum Master almost 4 years ago

  • Parent task changed from #21299 to #21455

#4 Updated by Joël Cuissinat almost 4 years ago

  • Parent task changed from #21455 to #21895

#5 Updated by Daniel Dehennin almost 4 years ago

  • Parent task changed from #21895 to #22215

#6 Updated by Joël Cuissinat over 3 years ago

  • Story points set to 1.0

#7 Updated by Joël Cuissinat over 3 years ago

  • Parent task deleted (#22215)

#8 Updated by Joël Cuissinat over 3 years ago

  • Tracker changed from Tâche to Scénario
  • Due date set to 01/19/2018
  • Target version changed from sprint 2017 49-51 Equipe MENSR to Sprint 2018 02-04 Equipe PNE-SR
  • Start date set to 01/02/2018

#9 Updated by Joël Cuissinat over 3 years ago

  • Target version changed from Sprint 2018 02-04 Equipe PNE-SR to sprint 2018 02-04 Equipe MENSR

#10 Updated by Joël Cuissinat over 3 years ago

  • Assigned To set to Fabrice Barconnière

#11 Updated by Laurent Flori over 3 years ago

  • Assigned To changed from Fabrice Barconnière to Laurent Flori

#12 Updated by Joël Cuissinat over 3 years ago

  • Status changed from Nouveau to Terminé (Sprint)

Also available in: Atom PDF