Project

General

Profile

Tâche #19977

Scénario #19900: Tests et qualification (13-15)

Mettre en place une infra de test pour l'agrégation

Added by Fabrice Barconnière over 6 years ago. Updated over 6 years ago.

Status:
Fermé
Priority:
Normal
Start date:
03/24/2017
Due date:
% Done:

100%

Estimated time:
6.00 h
Spent time:
Remaining (hours):
0.0

Description

  • Une 2ème gateway sur les mêmes réseaux que la première gateway
  • Une configuration agregation pour etb1.amon
    • 1 alias sur interface 0 en 192.168.1.31 vers sur gateway 2 en 192.168.1.1

Associated revisions

Revision d7e291d1 (diff)
Added by Gilles Grandgérard over 6 years ago

Ajout Gateway Agregation (scripts contextualisation/configuration +
IP_AGREGATION)

REF #19977 @2h

Revision b8597ebf (diff)
Added by Fabrice Barconnière over 6 years ago

Ajout de la configuration agregtion pout etb1.amon

ref #19977 @15m

Revision a3d7cff6 (diff)
Added by Fabrice Barconnière over 6 years ago

Configuration de l'IP GW agregation et RW

ref #19977 @10m

Revision 39febea6 (diff)
Added by Fabrice Barconnière over 6 years ago

Libération de l'adresse IP GW de Lohysia pour permettre de l'utiliser
pour l'agrégation

ref #19977 @10m

Revision a3e89a75 (diff)
Added by Gilles Grandgérard over 6 years ago

suppression etb7

REF #19977 @1h

History

#1 Updated by Scrum Master over 6 years ago

  • Status changed from Nouveau to En cours

#2 Updated by Scrum Master over 6 years ago

  • Assigned To set to Fabrice Barconnière

#3 Updated by Fabrice Barconnière over 6 years ago

  • Description updated (diff)

#4 Updated by Fabrice Barconnière over 6 years ago

  • Description updated (diff)

#5 Updated by Scrum Master over 6 years ago

  • Status changed from En cours to Résolu

#6 Updated by Fabrice Barconnière over 6 years ago

  • % Done changed from 0 to 100
  • Remaining (hours) changed from 6.0 to 0.0

OK gateway agrégation opérationnelle

#7 Updated by Fabrice Barconnière over 6 years ago

  • Status changed from Résolu to Fermé

Also available in: Atom PDF