Project

General

Profile

Tâche #13315

Scénario #15611: Finaliser le serveur de génération d’images ISO pour EOLE 2.6

Anticiper la disparition du mode legacy des bios avec la prise en charge de l'UEFI.

Added by Benjamin Bohard about 6 years ago. Updated over 5 years ago.

Status:
Fermé
Priority:
Normal
Assigned To:
-
Start date:
03/29/2016
Due date:
04/15/2016
% Done:

0%

Estimated time:
2.00 h
Remaining (hours):
0.0

Description

Il faut mettre à jour le système de génération d’image ISO (OS + outils).

J’en ai monté un « from scratch » pour Mimuntu afin de prévoir la mise à jour du notre pour nettoyer « l’historique ».

Il faudra :

History

#1 Updated by Benjamin Bohard about 6 years ago

  • Subject changed from Anticiper la disparituon du mode legacy des bios avec la prise en charge de l'UEFI. to Anticiper la disparition du mode legacy des bios avec la prise en charge de l'UEFI.

#2 Updated by Daniel Dehennin about 6 years ago

  • Story points set to 3.0

Il faut mettre à jour le système de génération d’image ISO (OS + outils).

J’en ai monté un « from scratch » pour Mimuntu afin de prévoir la mise à jour du notre pour nettoyer « l’historique ».

Il faudra :

#3 Updated by Scrum Master about 6 years ago

  • Release set to EOLE 2.4.2.1

#4 Updated by Scrum Master about 6 years ago

  • Description updated (diff)
  • Release changed from EOLE 2.4.2.1 to EOLE 2.6.0

#5 Updated by Scrum Master over 5 years ago

  • Due date set to 04/15/2016
  • Target version set to sprint 2016 13-15 - Equipe MENESR
  • Start date set to 03/29/2016

#6 Updated by Scrum Master over 5 years ago

  • Assigned To set to force orange

#7 Updated by Joël Cuissinat over 5 years ago

  • Assigned To changed from force orange to force rouge

#8 Updated by Scrum Master over 5 years ago

  • Tracker changed from Scénario to Tâche
  • Estimated time set to 2.00 h
  • Parent task set to #15611
  • Remaining (hours) set to 2.0

#9 Updated by Daniel Dehennin over 5 years ago

  • Assigned To changed from force rouge to Daniel Dehennin

#10 Updated by Daniel Dehennin over 5 years ago

  • Project changed from Distribution EOLE to Images CD
  • Assigned To deleted (Daniel Dehennin)

Tester sur grichka.

#11 Updated by Scrum Master over 5 years ago

  • Status changed from Nouveau to Fermé
  • Remaining (hours) changed from 2.0 to 0.0

Also available in: Atom PDF