Project

General

Profile

Tâche #11470

Scénario #11432: Réaliser un POC de module Active Directory avec Samba 4

Ouvrir les ports du firewall

Added by Philippe Caseiro over 6 years ago. Updated over 6 years ago.

Status:
Reporté
Priority:
Normal
Assigned To:
Start date:
04/20/2015
Due date:
% Done:

80%

Estimated time:
1.00 h
Spent time:
Remaining (hours):
0.0

Description

Il faut ouvrir les ports de Samba

464
53
88
636
1024
3268
3269
389
135


Related issues

Related to creole - Scénario #11498: Supporter les plages de ports dans les balises <service_access> Nouveau
Copied to EOLE AD DC - Tâche #11512: Ouvrir les ports du firewall Fermé 04/20/2015

Associated revisions

Revision da2734f2 (diff)
Added by Philippe Caseiro over 6 years ago

dicos/25_smb_ad.xml: Ouverture des ports pour samba4

Déclaration des ouvertures de ports pour le service AD de samba4

fixes #11470 40m

Revision 72f4160b (diff)
Added by Philippe Caseiro over 6 years ago

Correction des scripts et des ouvertures de ports pour Samba

Il reste un problème on doit ouvrir une plage de ports (1024-5000).
Cette option ne semble pas disponible dans creole.

ref #11446 @10m
ref #11470 @1h
ref #11497 @10m

History

#1 Updated by Philippe Caseiro over 6 years ago

  • Estimated time set to 1.00 h
  • Remaining (hours) set to 1.0

#2 Updated by Scrum Master over 6 years ago

  • Status changed from Nouveau to En cours

#3 Updated by Scrum Master over 6 years ago

  • Description updated (diff)
  • Assigned To set to Philippe Caseiro

#4 Updated by Philippe Caseiro over 6 years ago

  • Status changed from En cours to Résolu
  • % Done changed from 0 to 100

#5 Updated by Philippe Caseiro over 6 years ago

  • Remaining (hours) changed from 1.0 to 0.0
  • Remaining (hours) changed from 0.0 to 0.1

#6 Updated by Philippe Caseiro over 6 years ago

  • Status changed from Résolu to Nouveau

#7 Updated by Philippe Caseiro over 6 years ago

  • Status changed from Nouveau to En cours

#8 Updated by Philippe Caseiro over 6 years ago

  • Remaining (hours) changed from 0.1 to 1.0

#9 Updated by Philippe Caseiro over 6 years ago

  • % Done changed from 100 to 80

#10 Updated by Philippe Caseiro over 6 years ago

  • Status changed from En cours to Reporté
  • Remaining (hours) changed from 1.0 to 0.0

Also available in: Atom PDF