Project

General

Profile

Scénario #11045

Correction des problèmes d'affichage de formulaire OTP (EoleSSO 2.4.X)

Added by Bruno Boiget about 6 years ago. Updated over 5 years ago.

Status:
Terminé (Sprint)
Priority:
Normal
Assigned To:
Category:
-
Start date:
03/26/2015
Due date:
07/10/2015
% Done:

100%

Estimated time:
(Total: 2.00 h)
Spent time:
4.00 h (Total: 60.00 h)
Story points:
2.0
Remaining (hours):
0.00 hour
Velocity based estimate:
Release:
Release relationship:
Auto

Subtasks

Tâche #11050: corriger l'affichage du formulaire de saisie du second token en cas de clé désynchroniséeFerméBruno Boiget

Associated revisions

Revision d64acc44 (diff)
Added by Bruno Boiget about 6 years ago

Mise en place d'entêtes HTTP sur l'ensemble des ressources

ref #11045 @2h

Revision ca771a44 (diff)
Added by Bruno Boiget almost 6 years ago

Encoding des templates OTP

ref #11045

Revision f7b1083c (diff)
Added by Bruno Boiget almost 6 years ago

Mise en place d'entêtes HTTP sur l'ensemble des ressources

ref #11045 @2h

Revision e7cd0aa8 (diff)
Added by Bruno Boiget almost 6 years ago

Encoding des templates OTP

ref #11045

History

#1 Updated by Joël Cuissinat almost 6 years ago

  • Due date set to 05/29/2015
  • Target version set to Sprint_2015_20-22 - Équipe MENESR
  • Start date set to 05/11/2015

#2 Updated by Joël Cuissinat almost 6 years ago

  • Assigned To set to force verte
  • Release set to Mise à jour 2.4.1.1

#3 Updated by Joël Cuissinat almost 6 years ago

  • Due date deleted (05/29/2015)
  • Target version deleted (Sprint_2015_20-22 - Équipe MENESR)
  • Start date deleted (03/26/2015)
  • Release changed from Mise à jour 2.4.1.1 to EOLE 2.4.2

#4 Updated by Joël Cuissinat almost 6 years ago

  • Release changed from EOLE 2.4.2 to Mise à jour 2.4.1.2

#5 Updated by Scrum Master almost 6 years ago

  • Release changed from Mise à jour 2.4.1.2 to EOLE 2.4.2

#6 Updated by Joël Cuissinat almost 6 years ago

  • Assigned To deleted (force verte)

#7 Updated by Scrum Master almost 6 years ago

  • Due date set to 07/10/2015
  • Assigned To set to force bleue
  • Target version set to Sprint_2015_26-28 - Équipe MENESR
  • Start date set to 06/22/2015

#8 Updated by Scrum Master almost 6 years ago

  • Assigned To changed from force bleue to force jaune

#9 Updated by Joël Cuissinat over 5 years ago

  • Status changed from Nouveau to Terminé (Sprint)

Also available in: Atom PDF