Project

General

Profile

Scénario #18663

Amélioration de la configuration NTP

Added by Luc Bourdot over 6 years ago. Updated over 6 years ago.

Status:
Terminé (Sprint)
Priority:
Normal
Assigned To:
Category:
-
Start date:
01/21/2017
Due date:
02/10/2017
% Done:

100%

Estimated time:
(Total: 10.00 h)
Spent time:
(Total: 5.33 h)
Story points:
2.0
Remaining (hours):
0.00 hour
Velocity based estimate:
Release:
Release relationship:
Auto

Description

  • Mettre un seul paramètre du pool NTP ne configure qu'un seul serveur, il faut en déclarer plusieurs:
    dans /etc/ntp.conf.

server 0.fr.pool.ntp.org iburst dynamic
server 1.fr.pool.ntp.org iburst dynamic
server 2.fr.pool.ntp.org iburst dynamic
server 3.fr.pool.ntp.org iburst dynamic
ou
pool fr.pool.ntp.org

et aussi

# Use Ubuntu's ntp server as a fallback.
pool ntp.ubuntu.com

# Needed for adding pool entries
restrict source notrap nomodify noquery

Utiliser les serveurs du Pool fr pour un meilleur délai de réponse.

Le diagnose est lent et trop souvent en erreur (faux positif)

Utiliser la commande /usr/bin/ntpq -p à la place de ntpdate (pas besoin de faire une boucle!) Attention le $? est à zero faire un grep pour trouver l'erreur


Subtasks

Tâche #18808: Implémenter les modifications de configuration proposées dans le scénarioFerméPhilippe Caseiro

Tâche #18809: Améliorer le test diagnose NTPFerméPhilippe Caseiro

Tâche #18926: Backporter la nouvelle configuration en 2.6.0FerméPhilippe Caseiro

Tâche #18927: Backporter les modifications pour Diagnose en 2.6.0FerméPhilippe Caseiro

History

#1 Updated by Luc Bourdot over 6 years ago

  • Tracker changed from Proposition Scénario to Scénario
  • Description updated (diff)
  • Release set to EOLE 2.6.1
  • Story points set to 2.0

backport 2.6.0

#2 Updated by Luc Bourdot over 6 years ago

  • Description updated (diff)

#3 Updated by Luc Bourdot over 6 years ago

  • Description updated (diff)

#4 Updated by Luc Bourdot over 6 years ago

  • Description updated (diff)

#5 Updated by Luc Bourdot over 6 years ago

  • Description updated (diff)
  • Due date set to 02/10/2017
  • Assigned To set to force verte
  • Target version set to sprint 2017 4-6 Equipe MENSR
  • Start date set to 01/23/2017

#6 Updated by Luc Bourdot over 6 years ago

  • Description updated (diff)

#7 Updated by Laurent Flori over 6 years ago

  • Status changed from Nouveau to Terminé (Sprint)

Also available in: Atom PDF