Project

General

Profile

Scénario #15286

Préparer l'ajout et la gestion d'EOLE 2.6.0 dans Zéphir

Added by Bruno Boiget over 5 years ago. Updated over 5 years ago.

Status:
Terminé (Sprint)
Priority:
Normal
Assigned To:
Category:
Version mineure
Start date:
03/03/2016
Due date:
04/15/2016
% Done:

100%

Estimated time:
(Total: 6.00 h)
Spent time:
(Total: 3.67 h)
Story points:
2.0
Remaining (hours):
0.00 hour
Velocity based estimate:
Release:
Release relationship:
Auto

Description

  • Ajouter les dictionnaires / modules Eole 2.6.0
  • laisser un 'trou' entre 2 versions.
  • Modifications nécessaires pour permettre la configuration de tous les modules supportés (creole/tiramisu).

Subtasks

Tâche #15287: Ajout des données pour les modules 2.6.0FerméBruno Boiget

Tâche #15288: Modifier le code se basant sur l'id de distribution pour gérer la version.FerméBruno Boiget

History

#1 Updated by Scrum Master over 5 years ago

  • Subject changed from Zéphir : Préparer l'ajout d'Eole 2.6.0 et d'éventuelles versions 2.5 intermédiaires to Zéphir : Préparer l'ajout d'Eole 2.6.0

#2 Updated by Scrum Master over 5 years ago

  • Description updated (diff)

#3 Updated by Bruno Boiget over 5 years ago

  • Description updated (diff)
  • Status changed from À formaliser to Nouveau

#4 Updated by Scrum Master over 5 years ago

  • Tracker changed from Proposition Scénario to Scénario
  • Start date deleted (03/03/2016)
  • Release set to EOLE 2.6.0
  • Story points set to 6.0

#5 Updated by Scrum Master over 5 years ago

  • Due date set to 04/15/2016
  • Target version set to sprint 2016 13-15 - Equipe MENESR
  • Start date set to 03/29/2016

#6 Updated by Scrum Master over 5 years ago

  • Assigned To set to force orange

#7 Updated by Joël Cuissinat over 5 years ago

  • Subject changed from Zéphir : Préparer l'ajout d'Eole 2.6.0 to Préparer l'ajout et la gestion d'Eole 2.6.0 dans Zéphir

#8 Updated by Emmanuel GARETTE over 5 years ago

  • Story points changed from 6.0 to 2.0

#9 Updated by Gérald Schwartzmann over 5 years ago

  • Subject changed from Préparer l'ajout et la gestion d'Eole 2.6.0 dans Zéphir to Préparer l'ajout et la gestion d'EOLE 2.6.0 dans Zéphir

#10 Updated by Joël Cuissinat over 5 years ago

  • Status changed from Nouveau to Terminé (Sprint)

Also available in: Atom PDF