Scénario #11706
Faire fonctionner la haute disponibilité sur EOLE 2.5 (Sphynx inclus)
Status:
Terminé (Sprint)
Priority:
Normal
Assigned To:
Category:
-
Target version:
Start date:
05/18/2015
Due date:
12/18/2015
% Done:
100%
Estimated time:
(Total: 38.50 h)
Spent time:
(Total: 50.67 h)
Story points:
5.0
Remaining (hours):
0.00 hour
Velocity based estimate:
Release:
Release relationship:
Auto
Description
Le produit Pacemaker a évolué. Il faut adapter la configuration et les scripts.
Subtasks
History
#1 Updated by Scrum Master over 8 years ago
- Description updated (diff)
- Distribution changed from EOLE 2.5 to EOLE 2.4
#2 Updated by Joël Cuissinat over 8 years ago
- Release set to Mise à jour 2.4.1.2
#3 Updated by Scrum Master over 8 years ago
- Release changed from Mise à jour 2.4.1.2 to EOLE 2.4.2
#4 Updated by Scrum Master over 8 years ago
- Release changed from EOLE 2.4.2 to EOLE 2.5.1
#5 Updated by Gérald Schwartzmann about 8 years ago
- Release deleted (
EOLE 2.5.1)
#6 Updated by Joël Cuissinat about 8 years ago
- Due date set to 10/09/2015
- Target version set to Sprint 2015 39-41 - Équipe MENESR
- Start date set to 09/21/2015
- Story points set to 2.0
#7 Updated by Joël Cuissinat about 8 years ago
- Assigned To set to force indigo
- Release set to EOLE 2.5.1
#8 Updated by Fabrice Barconnière about 8 years ago
- Subject changed from Vérifier la supervision de la ressource arv_rsc en mode haute dispo to Faire fonctionner la haute disponibilité sur EOLE 2.5.1 (Sphynx inclus)
- Description updated (diff)
- Story points changed from 2.0 to 5.0
- Distribution changed from EOLE 2.4 to EOLE 2.5
#9 Updated by Scrum Master almost 8 years ago
- Project changed from Distribution EOLE to eole-pacemaker
- Subject changed from Faire fonctionner la haute disponibilité sur EOLE 2.5.1 (Sphynx inclus) to Faire fonctionner la haute disponibilité sur EOLE 2.5 (Sphynx inclus)
- Due date deleted (
10/09/2015) - Assigned To deleted (
force indigo) - Target version deleted (
Sprint 2015 39-41 - Équipe MENESR) - Start date deleted (
05/18/2015) - Release changed from EOLE 2.5.1 to EOLE 2.5.2
#10 Updated by Scrum Master almost 8 years ago
- Due date set to 11/20/2015
- Target version set to Sprint 2015 45-47 - Équipe MENESR
- Start date set to 11/02/2015
#11 Updated by Joël Cuissinat almost 8 years ago
- Assigned To set to force indigo
#12 Updated by Joël Cuissinat almost 8 years ago
- Status changed from Nouveau to Terminé (Sprint)